Skip to main content
Editor's pickStartupRoC Hyderabad Jurisdiction

Copper Lead And Zinc Smelting Plant Setup in Hyderabad

File for metal smelting plant setup with confidence. I-Pro Solutions provides step-by-step guidance, document checklists, fee breakdown and online submission for.

Turnaround
7-14 Working Days
₹
Starts from
₹1,57,499
Money-back accuracy
Guaranteed
Total starting from
₹1,57,499
7-14 Working Days
Prof: ₹57,499•Govt: ₹1,00,000 - ₹5,00,000• Guaranteed
WhatsApp

Dedicated specialist

CA-led, named point of contact

Tracked client portal

Real-time status, end-to-end

Money-back accuracy

Refile-free if our error

Flat-fee pricing

No hidden charges, ever

About this service

Copper Lead And Zinc Smelting Plant Setup in Hyderabad is a key regulatory filing administered by MoEFCC for EC (Category A — EAC-1 Industry). Co-regulators: CPCB (emission/effluent norms); State Pollution Control Board (Consents + Hazardous Waste Authorisation); Indian Bureau of Mines (IBM) for captive mine plan approval; DGMS for mine safety; AERB for radioactive by-products; Central Ground Water Authority (CGWA) for groundwater abstraction NOC.. Filing is executed via Same as Carbon Black — Form 1, Form 1A, Form 1M, TOR Application, EIA/EMP Report, Form 4 (compliance). Additionally: under **Environment (Protection) Act, 1986** + **EIA Notification 2006** (S.O. 1533 dated 14.09.2006) — Schedule 1 **Item 3(a): "Primary Metallurgical Industry (notified processing routes)"** — Category A. The "notified processing routes" include: copper smelting (≥50,000 TPA), lead smelting (≥50,000 TPA), zinc smelting (≥50,000 TPA), aluminium smelting (≥2,00,000 TPA — separate sub-category). **Environment (Protection) Rules, 1986 — Schedule I** (industry-specific emission/effluent standards for non-ferrous metallurgical industries — Notification G.S.R. 176(E) dated 02.04.1992, revised 2008, 2016). **Water (Prevention and Control of Pollution) Act, 1974** — Section 25. **Air (Prevention and Control of Pollution) Act, 1981** — Section 21. **Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016** — Rule 5 (authorisation for hazardous wastes — arsenic trioxide, lead slag, zinc dross, copper slag). **Public Liability Insurance Act, 1991**. **Mines and Minerals (Development and Regulation) Act, 1957** — Section 4 (captive mining lease if integrated with captive mine). **Atomic Energy Act, 1962** — for any monazite / rare earth by-products (AERB approval). **Mines Act, 1952** + Coal Mines Regulations 2017 — Directorate General of Mines Safety (DGMS) approval for captive mine.. Our specialist-led team ensures full compliance with statutory documentation, eligibility verification, and expedited government approval.

Eligibility & thresholds

Minimum
  • Valid identity & address proof of applicant
  • Active PAN & registered business premises
  • Authorized representative authorization
Maximum
  • Compliant under applicable regulatory laws
  • No pending statutory disqualifications
  • Valid across authorized operational jurisdictions
Statutory floor
  • Pre-filing statutory documentation verification
  • Official statutory fee schedule as per authority
  • Mandatory periodic compliance filings post-approval

What's included

Everything in one transparent fee — no add-ons, no surprises.

Documentation Review & Drafting
Our legal experts review applicant credentials, draft statutory forms, and prepare required declarations.
Official Portal Filing
Direct electronic submission on the competent regulatory portal with statutory receipt generation.
Application Tracking & Liaison
End-to-end monitoring of department scrutiny, status updates, and milestone alerts.
Specialist CA/CS Scrutiny
Every application is thoroughly audited by qualified corporate compliance professionals before filing.
Clarification & Query Handling
Prompt preparation and submission of replies to department queries or clarification requests.
Final Registration & Certificate Delivery
Official digital certificate issuance with post-approval compliance guidance.

Government Fee Breakdown

Government charges only — separate from I-Pro's professional fee. All figures verified as of 25 August 2026.

Fee Component
Copper Lead And Zinc Smelting Plant Setup in Hyderabad Statutory Fee
Amount (₹)
₹1,00,000 - ₹5,00,000
Basis / Authority
Official government fee schedule (separate from professional fee)Statutory Authority
Total Government Fee
₹1,00,000 - ₹5,00,000
(for default assumptions stated below)

Government charges only — verified statutory schedule for Hyderabad, Telangana. Professional fee separate.

Required documents

Each list identifies exactly what to provide — and what you do not need to submit. Use the accordions to expand.

  • 1
    Same composite set as Carbon Black (PAN, GSTIN, constitution, project report, site documents, EIA, E
    Same composite set as Carbon Black (PAN, GSTIN, constitution, project report, site documents, EIA, EMP, public hearing report, CGWA NOC). Additionally:
  • 2
    Mining Lease grant order (if captive mine).
    Mining Lease grant order (if captive mine).
  • 3
    Mining Plan approval from IBM.
    Mining Plan approval from IBM.
  • 4
    DGMS Mine Safety approval.
    DGMS Mine Safety approval.
  • 5
    Hazardous Waste Authorisation Form 1 from SPCB.
    Hazardous Waste Authorisation Form 1 from SPCB.
  • 6
    Inventory of hazardous by-products (arsenic, lead, zinc dross, slag).
    Inventory of hazardous by-products (arsenic, lead, zinc dross, slag).
  • 7
    AERB NOC (if monazite/rare earth by-products present).
    AERB NOC (if monazite/rare earth by-products present).
  • 8
    Public Liability Insurance for hazardous chemical handling.
    Public Liability Insurance for hazardous chemical handling.
  • 9
    Technology licence agreement (if foreign technology imported).
    Technology licence agreement (if foreign technology imported).

How it works

Each step is labelled with who performs it — Customer, I-Pro, or the Regulator. Form names are linked to the official portal.

  1. 1
    I-Pro⏱ Day 1-2

    Step 1: Industrial Categorization & Scope Assessment

    Classifying unit into Red/Orange/Green/White industrial category based on CPCB pollution index scores and plant production capacity.
  2. 2
    Customer⏱ Day 2-4

    Step 2: Technical Project Report & Effluent Plan Audit

    Compiling plant layout, manufacturing flow chart, water balance sheet, ETP/STP flow diagrams, and hazardous material storage details.
  3. 3
    I-Pro⏱ Day 4-5

    Step 3: Portal Submission & Statutory Fee Payment

    Electronic filing on the State Single Window / OCMMS / Department portal with statutory treasury fee submission.
  4. 4
    Regulator⏱ Day 5-12

    Step 4: Department Inspection & Field Verification

    Liaison with inspecting regional officer, environmental engineer, or district fire officer during physical premise inspection.
  5. 5
    I-Pro⏱ Day 12-21

    Step 5: Statutory Consent Grant & NOC Delivery

    Securing signed statutory Consent to Establish (CTE) / Consent to Operate (CTO) / NOC order with continuous compliance handbook.

Post-registration compliance

What to file next. I-Pro handles these as part of the annual compliance package.

Filing
Commencement of Business (Form INC-20A)
Penalty: ₹50,000 for company + ₹1,000/day for directors (max ₹1 Lakh)
Form
One-time mandatory
Deadline
Within 180 days of incorporation after bank capital deposit
Filing
First Auditor Appointment (Form ADT-1)
Penalty: Statutory non-compliance; prosecution of defaulting officers
Form
5-year tenure
Deadline
Within 30 days of incorporation by Board of Directors
Filing
Annual Financial Statements (Form AOC-4)
Penalty: ₹100 per day of delay per form with no statutory ceiling
Form
Annual
Deadline
Within 30 days of AGM (by 29 October annually)
Filing
Annual Return (Form MGT-7)
Penalty: ₹100 per day of delay per form with no statutory ceiling
Form
Annual
Deadline
Within 60 days of AGM (by 29 November annually)
Filing
Director KYC Verification (DIR-3 KYC)
Penalty: ₹5,000 statutory fee per DIN + deactivation
Form
Annual
Deadline
Every designated partner / director holding active DIN by 30 September

Frequently asked questions

Everything you need to know about this service.

Client feedback

What clients say

Real reviews from founders, finance leads and operators who used our Copper Lead And Zinc Smelting Plant Setup in Hyderabad service.

No reviews yet

Be the first to share your experience with Copper Lead And Zinc Smelting Plant Setup in Hyderabad.

Recommended Bundles

Instead of buying these services separately, get them together as a package.

Premium

Heavy Industry Premium Pack

Carbon black / heavy industry + Factory + BOCW + ISO 14001 + ISO 45001 + PESO — full industrial compliance.

Individual Total₹1,98,393
Bundle Price₹1,79,015
You save ₹19,379 (20%)
Get Started →
Growth

Green Industry Growth Pack

Green hydrogen + Renewable energy business + ISO 14001 + ISO 50001 + Factory license.

Individual Total₹3,42,994
Bundle Price₹3,21,620
You save ₹21,375 (15%)
Get Started →
Starter

Plant Setup Starter Pack

Factory license + BOCW + Trade license — minimum plant setup compliance.

Individual Total₹1,67,096
Bundle Price₹1,60,587
You save ₹6,510 (10%)
Get Started →
Swipe for more bundles →
Call ExpertWhatsApp